Emlid Flow and Flow 360 — Connect Field Surveying with Office Workflows

Emlid Flow is the mobile application for configuring Reach receivers, managing corrections and performing survey tasks. Flow 360 is the web-based workspace for project preparation, synchronisation, team coordination and office-side review. Current plan presentation separates Free and Pro capabilities.

Technical content reviewed against official sources · 16 November 2026
Emlid Flow mobile survey interface for field data collection.
Emlid Flow field-survey interface. Official manufacturer reference image.
WORKFLOW ARCHITECTURE01 — 04
01PREPARE PROJECT
02CONFIGURE ROVER
03COLLECT + SYNC
04REVIEW + EXPORT

Observed data, configuration and quality evidence remain attached through handover.

Where Emlid Flow and Flow 360 fits in the working system.

Flow connects the receiver to a structured field project. Teams can configure base or rover settings, correction input, coordinate systems and logging, then collect or stake out points and linework with codes and attributes. Flow 360 provides the connected office workspace for supported project and collaboration functions.

Not every advanced function is included in the Free plan. Emlid’s current presentation uses Free and Pro; the former Survey plan was renamed Pro, and existing arrangements may have different individual or team treatment. Confirm the current plan, user count and required features before procurement.

A controlled route from receiver settings to project data.

Receiver and corrections

Configure Reach devices, base/rover roles, NTRIP and other supported correction links, position output and raw-data logging.

Collection and stakeout

Collect points and supported linework, use survey codes and attributes, and navigate to design geometry with appropriate field checks.

Coordinates and data exchange

Set project coordinate systems and use supported CSV, DXF, SHP and KML import/export routes. Validate the resulting files in the target system.

Synchronisation and collaboration

Prepare and review projects through Flow 360, synchronise supported field data and manage collaboration according to plan limits.

Select the plan by responsibility.

Feature availability and limits can change. Existing Survey-plan arrangements should be checked against their specific commercial terms.

Emlid Flow and Flow 360: Select the plan by responsibility.
Workflow areaFreePro
Receiver configuration and correctionsCore configuration workflowIncluded with broader professional functions
Point collection, stakeout and coordinate systemsCore survey functionsIncluded
CSV, DXF, SHP and KML exchangeSupported import/export functionsSupported, with additional professional workflows
CAD/DTM work, localisation and COGONot the core Free feature setAdvanced functions according to current plan
Advanced linework, code libraries and reportsLimited by comparisonExpanded professional functions
Collaboration and storageIncluded with stated limitsMore storage and unlimited team members in current presentation

Turn a receiver observation into a usable GIS feature.

01 / Define the schema

Create a code library for asset ID, utility type, material, diameter, installation status and inspection notes, with mandatory fields agreed.

02 / Prepare the project

Set the horizontal and vertical references, correction profile, antenna height, collection method and known-point checks.

03 / Collect and synchronise

Observe visible assets, attach the correct code and note inaccessible or ambiguous features. Synchronise through the approved project route.

04 / Review and export

Check attributes, geometry and coordinates in Flow 360 or the office environment, then export and test the required GIS/CAD files.

Do not confuse a file format with a valid handover.

Horizontal reference
WGS84 latitude/longitude and SVY21 eastings/northings are different representations. Define the project CRS and transformation explicitly.
Height reference
Ellipsoidal GNSS height and the required project height may differ. Agree geoid or local height treatment and verify against known benchmarks.
Localisation
Where a Pro localisation workflow is used, document control, residuals, residuals review and applicability. Do not hide a poor reference behind a fitted transformation.
Export verification
Open a sample in the recipient CAD/GIS environment and inspect geometry, attributes, units, CRS and null values before production issue.

Train field and office roles separately.

Field operators need correction checks, antenna height, tilt, coding and exception handling. Office users need project setup, plan-aware feature access, synchronisation, coordinate review and export validation. A single generic app demonstration rarely covers both responsibilities.

Easepect can build a representative code library and project template, test the export route and document the operating procedure. Never send NTRIP passwords or subscription tokens through the general enquiry form.

Before choosing Emlid Flow and Flow 360.

Flow is the mobile field and receiver-configuration application. Flow 360 is the connected web workspace for project preparation, synchronisation, office review and collaboration. Their exact functions depend on the current plan.

Not sure which Emlid receiver suits your project?

Tell us what you are surveying, your operating environment and required deliverables. Model selection is optional; Easepect can help identify a suitable hardware and software workflow.