RTK GNSS Survey Support

Establish a dependable positioning workflow around corrections, coordinate settings, observation quality and independent checks—not around a nominal accuracy number alone.

Project scope, measured performance and acceptance criteria are confirmed for each appointment.
Emlid Reach RS4 Pro receiver with integrated dual-camera system
Reach RS4 Pro with its integrated dual-camera system. Official Emlid reference image; model suitability is assessed separately.

Understanding Your Project Requirements

RTK fieldwork can fail or produce misleading coordinates through correction interruptions, incorrect datum or projection settings, poor satellite visibility, unstable observations or inconsistent field records.

Easepect supports teams with receiver setup, field procedures and spatial-data checks. Project accuracy is evaluated from the actual observations and independent evidence, while licensed or registered survey responsibilities remain separately defined.

Our Services and Deliverables

Set up a practical receiver, correction and field-software workflow, then support observations, coordinate checks and team onboarding for the intended task.

01

Receiver and correction setup

Configure compatible hardware, communication, NTRIP or other correction routes and field software without requesting credentials through the website.

02

Coordinate configuration

Separate geographic and projected coordinates, horizontal and vertical references, units, geoid or height decisions and export settings.

03

Field observation support

Establish observation routines, solution-status checks, occupancy and metadata practices suited to the site and task.

04

Control and independent checks

Observe known points or independent checkpoints where required and report measured results with the field conditions.

05

Team onboarding

Document the operating sequence, common failure modes and escalation route for field and office users.

How We Deliver Your Project

Configuration is validated before production observations, followed by field logging, independent checks where required and a controlled export to the receiving system.

  1. 01

    Define the positioning task

    Confirm required outputs, project coordinate reference, tolerance, site environment and professional responsibilities.

  2. 02

    Select and configure

    Assess receiver, antenna, controller, correction service and software compatibility for the intended operation.

  3. 03

    Validate before production

    Check communication, correction age, solution status, coordinate settings and known-point behaviour before collecting project data.

  4. 04

    Observe and log

    Capture points or support reality capture while recording solution status, time, antenna details and exceptions.

  5. 05

    Check independently

    Compare agreed checkpoints or repeat observations and investigate discrepancies rather than averaging them away.

  6. 06

    Export and hand over

    Check field names, units, coordinates and metadata in the receiving GIS, CAD or processing environment.

Technology and Equipment

Receiver, controller, correction service and field software are chosen for compatibility, site visibility, coordinate requirements and the team’s operating routine.

01

Emlid Reach receivers

RS4 Pro, RS4, RX2 and RS3 address different field and integration requirements; compare the complete operating setup.

Compare Emlid receivers
02

Emlid Flow & Caster

Field collection, project settings and correction workflows, with current version and service scope verified for the deployment.

Explore Emlid software
03

Singapore RTK & SiReNT

Local correction and coordinate considerations, including the distinction between SVY21 horizontal coordinates and height-reference decisions.

Read the Singapore RTK guide
04

PIX4Dcatch RTK

Compatible mobile capture configurations can use external positioning for georeferenced visible-scene reconstruction.

Review PIX4Dcatch + Emlid
05

Global Mapper

Receive, transform and check spatial data using the tools available in the selected subscription.

Review coordinate workflows

Project Deliverables

Receive the agreed field configuration, observations, checkpoint results, exchange files and an operating checklist suited to your team.

01

Configured field workflow

Documented receiver, correction, coordinate and field-software settings appropriate to the agreed task.

02

Observation package

Agreed point or field observations with timestamps, solution information, antenna metadata and notes where supported.

03

Check-point results

Measured independent-check results where included, with coordinates, conditions and any excluded observations explained.

04

GIS or CAD exchange files

Agreed formats checked for geometry, fields, units and coordinate interpretation.

05

Operating checklist

A concise field sequence, QA gates and escalation notes for the customer’s team.

Accuracy Checks and Quality Assurance

Correction status, coordinate and height settings, antenna details and independent observations are reviewed as evidence from the actual field session.

  • Correction source, communication and solution behaviour checked
  • Horizontal coordinate reference and vertical reference recorded separately
  • Antenna height and observation metadata reviewed where applicable
  • Known-point or independent-check results reported as measured evidence
  • Obstructions, multipath, correction outages and unstable solutions documented
  • No nominal manufacturer accuracy presented as achieved site accuracy

Project Scope and Exclusions

Survey certification, unreliable observing environments and credential handling are addressed separately from routine equipment and workflow support.

  • Cadastral surveys or registered-surveyor certification unless separately and lawfully appointed
  • Guaranteed fixed solution, canopy performance or accuracy under all conditions
  • Disclosure or transfer of NTRIP passwords, subscription tokens or other credentials through the enquiry form
  • Automatic acceptance of coordinates by an authority, client or project specification
  • Unverified conversion between horizontal coordinates and height datums

Practical answers before you request a quotation.

No. Satellite visibility, multipath, corrections, observation method, coordinate configuration and site conditions affect results. Project performance needs field verification.

Request a Project Quotation

Tell us the positioning task, existing equipment and coordinate or height requirements. We will help define the setup, validation and training support required.