Start with constraints, not fashion
List project-data restrictions, available workstations, upload bandwidth, dataset sizes, processing deadlines, reviewer locations and IT administration capacity. A restricted infrastructure project and a distributed commercial construction team may rationally choose different architectures.
What changes operationally
The choice changes who maintains processing capacity, how data moves, how reviewers receive access and where failures are resolved. It does not change the physics of image measurement or eliminate reconstruction errors.
| Consideration | Desktop route | Cloud route |
|---|---|---|
| Hardware | Workstation CPU, RAM, GPU and storage need assessment | Local capture and review hardware still matters; processing is service-based |
| Connectivity | Needed for licence/update functions; processing can be local | Upload, processing status and browser review depend on connectivity |
| Data governance | Local storage and controlled exports | Service hosting, access, retention and share links require approval |
| Collaboration | Exports or separate shared storage for reviewers | Browser-based authorised review and annotations |
| Analysis depth | Full plan-dependent desktop survey tools | Plan-dependent online measurement and comparison tools |
| Failure responsibility | Local hardware, drivers, storage and project setup | Upload, service pipeline, account, credits and browser access |
Accuracy claims need the same scepticism in both
Cloud automation does not validate a control network, and a powerful desktop GPU does not repair poor coverage. Both routes require appropriate camera geometry, coordinate definitions, GCP/checkpoint decisions and inspection of reports and outputs. Compare independent checkpoints using the same acceptance method when evaluating routes.
A hybrid route needs version discipline
If one team processes locally and publishes online, identify which outputs are approved for sharing. If a cloud result is downloaded for further analysis, record its source and processing route. Avoid parallel uncontrolled edits that leave two different “final” datasets.
What to include in an Easepect pilot
A useful evaluation uses a real dataset and measures more than processing time. We document upload or transfer effort, workstation behaviour, reconstruction and QA results, reviewer tasks, export compatibility, data-governance approvals and the support needed by each role.